Photos: Installation of Pedestrian Bridge at Future Herndon Metro Station

As work on Phase 2 of Metro’s Silver Line project continues, a pedestrian walkway was recently set over the bus loop at the Herndon-Monroe Park and Ride facility.

The walkway, which will provide access to the Silver Line’s future Herndon Station from the south side of the Dulles Toll Road, will be integrated with existing and future infrastructure at the park and ride, according to information provided by the Dulles Corridor Metrorail Project.

The pedestrian bridge from the north side of the Dulles Toll Road (westbound lanes) is scheduled to be installed this weekend.

Construction work on Phase 2 of the Silver Line, which will extend the Metrorail from Reston to Ashburn, was reported in July to be more than 60 percent done. The line is expected to be opened to the public in 2020.

Photos courtesy Dusty Smith/Dulles Corridor Metrorail Project

Recent Stories

Morning Notes

Beaver munching on grass by Walney Pond in Chantilly (staff photo by Angela Woolsey) Shake Shack proposed for Kamp Washington Shopping Center — “Fairfax City Board of Architectural Review approved…

Taim Mediterranean Kitchen is officially open in Reston (Photo courtesy taim). Taim Mediterranean Kitchen in Reston has permanently closed just four months after its opening. The New York-based chain, known…

Morning Notes

Cat (staff photo by Vernon Miles) Cat declawing to be banned in Virginia — “Veterinarians will not be allowed to declaw cats in Virginia starting in July, unless there are certain…

The Knutson Companies is thrilled to announce new opportunities for Loudoun County living with the release of a new section of rooftop terrace townhomes and a brand new community of…

×

Subscribe to our mailing list