Lane and Ramp Closures Near Reston and Herndon This Week

Construction work on the second phase of the Metrorail Silver Line project brings lane and ramp closures from Monday (Dec. 3) until Saturday (Dec. 8).

Most of the closures avoid prime rush hour times.

In a post about the closures, the Dulles Corridor Metrorail Project reminds drivers to use caution; remain attentive to all signage, barricades and speed limits; and obey all police and flagger instructions. Work is subject to weather changes.

Eastbound on the Dulles Toll Road has alternating right and left lane closures from just west of the Route 28 overpass to the Reston Parkway overpass on the following days:

  • Monday to Friday: 10 a.m. to 3 p.m., 9 p.m. to 5 a.m.
  • Saturday: 10 a.m. to 3:30 p.m., 8 p.m. to 4 a.m.

Alternating right and left lane closures are also westbound on the Dulles Toll Road between the Route 28 and Reston Parkway overpass. These will be in effect:

  • Monday to Friday: 9:30 a.m. to 3 p.m., 8 p.m. to 5 a.m.
  • Saturday: 10 a.m. to 3:30 p.m., 8 p.m. to 5 a.m.

Also heading westbound is a ramp closure at mile marker 3.3 to Access Road. The ramp will be closed from 9:30 a.m. to 3 p.m. from Monday until Friday for striping.

Eastbound on Sunset Hills Road will have alternating right and left lane closures from 400 feet west of Town Center Pkwy to Bechtel Building Entrance. The civil work will take place from 9:30 a.m. to 3:30 p.m. from Monday to Thursday and from 9: 30 a.m. to noon on Friday.

Eastbound on Herndon Parkway from 1,000 feet east of Van Buren Street to 800 feet west of Exchange Place will have a right lane closed from 9:30 a.m. to 3:30 p.m. Monday to Thursday and from 9:30 a.m. to noon on Friday.

Several different spots westbound on Sunrise Valley Drive will have closed right lanes from 9:30 a.m. to 3:30 p.m. on Monday to Thursday and from 9:30 a.m. to noon on Friday, including:

  • from Dulles Technology Drive to Dulles Station Blvd
  • from Thunder Chase Drive to Millburn Lane
  • from Reston Pkwy to 200 feet west of Edmund Halley Drive

Edmund Halley Drive will have a right shoulder closed from 9:30 a.m. to 3:30 p.m. from Monday to Thursday and from 9:30 a.m. to noon on Friday.

Recent Stories

Herndon has finalized its vision for mixed-use development in the Transit-Related Growth Area (via Town of Herndon) In the future, Herndon hopes to see a vast swath of land near…

The Fairfax County Board of Supervisors (staff photo by James Jarvis) The Fairfax County Board of Supervisors has signed off on a 3-cent bump in its real estate tax rate,…

New vehicle lanes and a shared-use trail are officially open to travelers on Route 7 (Leesburg Pike) after almost five years of construction. The Virginia Department of Transportation announced last night…

Morning Notes

Buildings are under construction near the Wiehle-Reston Metro station (staff photo by Angela Woolsey) Man Gets Life in Prison for N. Va. Gang Killings — An MS-13 leader was sentenced…

×

Subscribe to our mailing list