Photos: Work Underway for RCC’s Aquatics Center Renovation

Work is underway on Reston Community Center’s Terry L. Smith Aquatics Center, which closed roughly one month ago for major renovations. 

RCC recently shared a construction update on the project, which will update the 40-year-old aquatics center with two pools, along with photos of the progress.

RCC staff vacated the area after the pool was drained in early January, according to the update.

Recently, the crew from Branch & Associates has been removing wiring and ductwork in the ceilings and walls. The contractors have installed a safety railing around the pool and covered the overlook windows, the update says, adding that the crew was slated to put in a construction camera last week.

Locals might have noticed that a construction fence and work trailer are now outside in RCC’s parking lot.

RCC says that it will post monthly construction updates with photos, allowing people can follow along with the progress on the pools.

The renovated facility, designed by RRMM-Lukmire Architects, will include a 25-yard lap pool with zero-depth entry, a warm-water therapeutic pool, updated infrastructure systems and a new roof. It is slated to reopen in October.

Photos via Reston Community Center

Recent Stories

Local police are investigating an incident of arson and graffiti that occurred at St. John Neumann Catholic Community Church in Reston yesterday (Sunday). The graffiti, which was found at the…

The greenery proposed for Amazon’s second headquarters in Arlington is so extensive that the company needs a greenhouse to keep it going. According to plans submitted to the county, Amazon…

Morning Notes

A trail bridge at Hidden Oaks Nature Center in Annandale (staff photo by Angela Woolsey) Virginia Reports Second Case of Monkeypox — “The patient is an adult male resident of…

The weekend is almost here. Before you try to process the end of the Roe v. Wade era or head to bed for some much-needed sleep, let’s revisit the past…

×

Subscribe to our mailing list